Complex buildings.
Considered solutions.
Specialist fire suppression for commercial projects, coordinated around the occupancy, fire strategy and the practical demands of the site.

TM Services on site · 14 Cavendish Square, London.
Built on the right
design basis.
A gallery, storage area and residential building can present very different fire risks. Commercial system selection starts with the occupancy and hazard, the project’s fire strategy and suitable manufacturer evidence.
We coordinate the installation with the project team, considering pipe routes, access, programme and the services already in the building.
- Project scope and fire strategy review
- System and manufacturer coordination
- Pipework routing and site installation planning
- Commissioning, handover and ongoing care

14 Cavendish Square.
Protection for an art space.
An Ultra Fog commercial water mist installation across a London art studio and gallery, with viewing spaces over three floors and storage on the lower ground floor.
Bring us into the conversation early.
Share the scope of works, drawings, fire strategy and project programme so we can assess the next step.
